After the Gasoline Log Splitter device, you should check it before starting. This is the first and important step of preparing for its operation. Let’s take a look!
- Check whether the fly knife and the bottom knife are tightened according to the regular tightening torque.
- The open area of the flying knife and the bottom knife of the integrated crusher should be within the range of 0.5-1mm (check with thickness inspection).
- There should be no metal debris in the machine.
- Turn the belt pulley of the comprehensive crusher by hand for more than one week without knocking.
- The tension of the V-belt is moderate, and the belt cover should be installed.
- The electrical system is in normal condition.
- The joints of the hydraulic system have excellent sealing and no oil leakage.
- The direction of operation of the knife roller and the feeding roller is correct.
In addition, the empty work of Log Splitter manufacturers' integrated crushers is 1-4 hours, and load cutting can only be carried out after the empty work is normal.