PP Fitting Wholesaler Accounted Selection Elements

Comments · 1830 Views

For example, in modern homes and large public venues, Pe Fitting is generally laid during the decoration process. However, when choosing this material, you must first pay attention to the thickness of the tube wall of the water collector. For a ground source heat pump tube that is too thin

 

For example, in modern homes and large public venues, Pe Fitting is generally laid during the decoration process. However, when choosing this material, you must first pay attention to the thickness of the tube wall of the water collector. For a ground source heat pump tube that is too thin, it will be damaged during use, but if the wall thickness is too thick, it may affect the heating effect. PP fitting wholesaler teaches you how to choose pe fitting.

It is also necessary to pay attention to the compressive strength when selecting. Only when the requirements of use are met, it will not be crushed and damaged during use. Secondly, in the selection process, the performance of the material also needs to be carefully tested, and remember not to use copper tubes that do not meet the standards.

In addition, the connection point of the ground source heat pump tube is also very important, try to choose copper, which can improve efficiency and ensure the quality of the connection point. In use, it needs to be able to resist many corrosive substances, and cannot be corroded by substances during use. This will affect the efficiency of the ground source heat pump and increase the use time.

Ground source heat pump pipes have many advantages and outstanding performance. Play a pivotal role in the construction of ground source heat pump air conditioning. The down tube of the ground source heat pump pipe is one of the key points of the project. Because the depth of the down tube determines the amount of heat used, the depth of the down tube must be guaranteed.

There are two methods for lowering the pipe: manual lowering and mechanical lowering. The U-shaped pipe and the grouting pipe should be bundled together before the pipe is lowered, and the lowering shall be carried out immediately after the drilling is completed. After the drilling is completed, there is a large amount of water in the hole. Due to the buoyancy of the water, it will cause certain difficulties in pipe release. Moreover, due to the large amount of sediment in the water, sedimentation will reduce the effective depth of the hole.

For this reason, every time a hole is drilled, PEX Crimp Fitting should be put in in time, and fixed measures to prevent floating should be taken. During the installation, care should be taken to maintain the coaxiality of the inner and outer pipes of the casing and the distance between the U-shaped pipe and the water pipe. For U-tube heat exchangers, special springs can be used to spread the two branches of the U-tube to reduce the heat return between the two tubes. After the pipe down is completed, ensure that the U-shaped pipe is exposed to the ground, and mark and locate the buried pipe area to facilitate subsequent construction.

We are one of the saddle clamp manufacturer and wecome to your come and purchase!

 

Comments