How To Transport Water Well Drilling Tools

Comments · 2134 Views

Before the equipment such as Water Well Drilling Tools goes down, the sealing of the car should be firm and reliable, and the main gearbox and the steel wire rope for transportation should be fixed.

  1. Before the equipment such as Water Well Drilling Tools goes down, the sealing of the car should be firm and reliable, and the main gearbox and the steel wire rope for transportation should be fixed.
  2. According to the construction orientation, installation sequence and transportation route, the main engine must be arranged in the front-back direction of the ground transportation route and the order of other equipment vehicles before it can be allowed to go down the well.
  3. When using electric locomotives (battery cars) for transportation, you must use stirrups and long connecting rods, and arrange for someone to follow the handlebar to ensure that the rig does not collide during transportation and does not damage the parts of the rig.
  4. Before the rig is transported up and down the mountain, a special person must be arranged to carry out a comprehensive inspection of the winch, wire rope, signal, safety facilities, etc. on the up and down the mountain, and it can be transported after confirming that it meets the lifting requirements.
  5. Strictly implement the "no driving system" when going up and down the road. The up and down signals must be checked to check the vehicle's closure and the problem should be dealt with in a timely manner.
  6. The winch driver and the signal hooker strictly implement the job responsibility system and operating procedures for this type of work.
  7. Transportation route: deputy well → depot bypass → track alley → 1301 track along the groove connecting lane → warehouse roof chamber contact lane → coal storage warehouse roof chamber in mining area.